Keller Lease

Re Work and Drilling Opportunity

Young County Texas Keller Lease Project

Brief Overview


PARTIES TO OPERATE:
Kingdom Exploration LLC / American Eagle Operating LLC / Energy Management Resources


LEASE NAMES:
Keller M.V. # 07485, Keller M.V. # 07484


LOCATION:
Young County , Eastern Shelf of The Permian Basin
LATITUDE: +32° 59’ 20.3994”N
LONGITUDE: -98° 41’ 34.7994”W


NUMBER OF WELLS:
• TEN (10) OLD
• FIVE (5) NEW


NET REVENUE:
80%(NRI)



Brief Summary


We plan to offset existing production with the drilling of 5 new wells and go back into 10 old wells utilizing latest technology to increase production giving the property 15 total producing wells. Read Phase 1 and Phase 2 for details.

The existing wells were drilled in the 70’s averaging 11BOPD Per a Well using 1970’s technology.

Project was purchased from Baron Energy a few months ago. Production was 10.4BOPD until the program was turned off due to a hole in the casing from one well. Our plan is to re-vamp 10 wells and drill 5 new wells.

Current project consist of 123 acres, split up into 2 leases, with 10 wells currently producing 10.4BOPD(“ Barrels of oil per a day”).

Keller M.V. 07485 has 7 producing/rework wells and 3 injection wells. Sitting on 100 Acres.

Keller M.V. 07484 has 3 producing/rework wells, 1 injection well, sitting on 23 acres.


Phase 1: On a well by well basis-maximize existing formation production


  • Go in the hole with wire line pull the tubing rods and down hole pump to confirm bottom hole location
  • Go in the hole with swivel rig or down hole sand pump with a work-over rig to clean out well below perforations and swab
  • Utilize current technology by running chlorine cased hole log and a Bond log
  • Evaluate Logs to determine up hole production zones to be perforated
  • Perforate the up hole pay zones
  • In some wells Utilize short range lateral drilling to penetrate formation 20 to 30 feet
  • Utilize an Acid Job or Sand frac to break down the formation
  • Swab well test for production
  • Re-Install Pump, Tubing Rods
  • Turn well to sales

Phase 2: On a well by well basis- new well drilling


  • Evaluate logs to determine the field geology for offset drilling locations
  • Drill and complete off set wells
  • Utilize current technology by running chlorine cased hole log
  • Turn well to sales